Full-blown Data Center delivered in modules 60% faster.

arrow_iconarrow_icon

Scroll

Fully prefabricated solution, configured and tested at the factory. Ideal application for ICT and telco operators, colocation, private cloud, networking infrastructure provider, military and government.

Reasons

Why CoreDC?

Time-and-climate proven solution from an experienced vendor with a system-integrator mentality. Nothing but the best EU quality in an all-in-one solution.

  • 01

    Smart Colocation Hub

    Our prefabricated midsize data center isn't just a space—it's a tech chameleon, versatile and ready for anything.

  • 02

    Precision in Quality & Scale

    Get the best of both worlds—unmatched quality and scalable power, all with a mind-blowing 60% time-saving. It's the future of efficiency.

  • 03

    Next-Gen Project Mastery

    We're not just tech enthusiasts; we're project visionaries. Tap into our expertise as system integrators and tech vendors, and let's redefine the game together.

  • 04

    Flexing the flexibility

    Flexibility is ingrained in our ICT and Power capacities, spanning from 500kW to 4000kW modules. This range empowers us to deliver design-ready solutions while providing a robust foundation for seamless customization.

Specifications
product-image

Prefabricated modular solution for mid- to large-scale data centers, providing high configuration flexibility and seamless scalability in 2 pre-made capacity steps.

  • CoreDC 500

    • ICT load capacity

      500 kW

    • Rack capacity

      96 - 128

    • Power Density/rack

      4 - 5 kW

    • Power Supply redundancy (single data hall)

      2N

    • Power Supply redundancy (two data halls)

      MFR

    • Cooling redundancy

      N+2

    • Cooling methods

      DX

  • CoreDC 1000

    • ICT load capacity

      1000 kW

    • Rack capacity

      96 - 128

    • Power Density/rack

      8 - 10 kW

    • Power Supply redundancy (single data hall)

      2N

    • Power Supply redundancy (two data halls)

      MFR

    • Cooling redundancy

      N+2

    • Cooling methods

      DX / Dual / CW

info-mark

In case you need exact technical data about the products, you can download them in PDF format

Download technical data
arrow_iconarrow_icon

Stages

Scaling your data center according to your actual needs, horizontally and vertically.

Fast solutions

Fast-tracked.

Accelerate returns thanks to process standardization, pre-configuration and lightning-speed deployment.

Design

  • Design

    3 weeks

Production

  • Procurement

    14 weeks

  • Production FAT

    6 weeks

On-site Implementation

  • Logistics Shipping

    2 weeks

  • On-site Assembly

    10 weeks

  • Testing Handover

    6 weeks

0 months

9 months

Site prep.

Site ready

angle-up
angle-up
image_0
image_1
image_2

Always on. Always in control.

Slash costs and boost efficiency with converged operations, transitioning from managing individual systems to a unified, autonomously operating integrated unit.

  • common:software-app.benefits.monitoring

    Real-time monitoring

  • common:software-app.benefits.control

    Control & automation

  • common:software-app.benefits.analytic

    Analytic services: predictive maintenance

  • common:software-app.benefits.optimization

    Operations optimization

From simple monitoring to advanced AI-powered control

Real-time monitoring:

Data Collection and Evaluation

  • Collects and evaluates data for Altrix downstream services including historian data
  • It always provides a real-time overview of the status and utilization of the monitored infrastructure
  • Configurable architecture based on predefined templates
  • Continues evaluation of data availability and quality
  • Long-term data consistency guarantee

Show more

arrow_iconarrow_icon

Control automation:

Predefined parameters, profiles, and operation processes for:

  • Troubleshooting​
  • Change in operating conditions
  • Testing procedures
  • Controlling the data room environment conditions

Controlled technologies (typically, not only):

  • Power generation and distribution systems
  • HVAC systems
  • Fuel management
  • Technological water treatment and distribution systems
  • Heat recovery systems
  • Heating systems
  • Power management includes renewable power sources

Show more

arrow_iconarrow_icon
Savings

Up to EUR 11 mil TCO savings

savings-image
savings-image

(500kW)

  • One-time cost-benefit

  • Time to operation benefit

  • Recurring cost-benefit (10Y NPV)

  • Total Benefit

-134

2719

8762

11 347

Up to 22% lower OPEX

  • icon_/img/icons/core-dc/energy-eficiency.svg

    High energy efficiency (low PUE)

  • icon_/img/icons/core-dc/low-maintenance.svg

    Low maintenance costs

  • icon_/img/icons/core-dc/opex-savings.svg

    Signification OpEx savings vs market standard stick-built (cheaper monitoring, operations, and maintenance) are the largest benefit

  • icon_/img/icons/core-dc/time-saved.svg

    Compared to stick-built alternatives time to operation saved is 15 months for Core (9vs24)

Global product

From Azerbaijan to Zimbabwe.

1000+ successful projects. 15 countries

Modular product

Benefits of TIER-Ready Design Awards

  • 01

    Reduces Risk

    Our TIER-Ready design review awards mirror traditional builds, ensuring that our prefabricated modular data centers meet the highest standards of quality, redundancy, and operational excellence.

  • 02

    Reduces Cost

    By achieving Tier Certification of deployed solutions, we help you save on the costs associated with data center builds. Our solutions are pre-certified, reducing the expenses tied to extensive certification processes.

  • 03

    Reduces Time

    Our prefabricated modular data centers are designed for quicker and less complex Tier Certification, significantly reducing the time required to get your data center operational.

  • 04

    Increases Availability

    Our TIER-Ready certified solutions increase availability and reduce outages, ensuring that your data center operations remain uninterrupted and reliable.

  • 05

    Lowers Total Cost of Ownership (TCO)

    Fully vetted real-world designs lower the total cost of ownership by optimizing resources, reducing risks, and enhancing operational efficiency.

Newsletter signup

Take a glimpse into the future with us.

I agree to the processing of personal data

Thank you for subscribing to our newsletter.
We will keep you updated.